Pengendalian Bahan Baku Produk Jamu Sinom dengan Metode Material Requirement Planning untuk Meminimasi Biaya Produksi Di UD. Sanfaat.

Authors

  • Country of Mustaqim Mustaqim Universitas Nahdlatul Ulama Pasuruan, Indonesia
  • Country of Bagus Adi Permana Bagus Adi Permana Universitas Nahdlatul Ulama Pasuruan, Indonesia
  • Country of Ratna Diah Yuniawati Ratna Diah Yuniawati Universitas Nahdlatul Ulama Pasuruan, Indonesia

DOI:

https://doi.org/10.55757/ekliptika.v6i2.1205

Keywords:

Cost minimization, material requirement planning, raw material control

Abstract

Sanfat is a company that produces Jamu Sinom drinks from traditional ingredients. This company often experiences difficulties in obtaining turmeric as the raw material. If this happens, it will certainly increase the production costs of Jamu Sinom. Therefore, it is necessary to control raw materials using the Material Requirement Planning (MRP) and Moving Average Forecast methods to determine future raw material needs. During this period, the company purchased an average of 75.0 kg. The ordering cost was Rp. 160,000 and the storage cost was Rp. 500,000. The total cost of raw material inventory in 1 year was Rp. 11,600,000. Based on calculations and analyses carried out using the Material Requirement Planning (MRP) method with lot-for-lot and Economic Order Quantity (EOQ) lot-for-lot calculations resulted in a total cost of Rp. 17,820,000 and the EOQ calculation resulted in a total cost of Rp. 8,140,000. The minimum raw material order is EOQ, which can be used as a raw material control solution for Sinom herbal products at UD. Sanfaat.

References

[1] R. Che, B. Mirani, M. Panah, X. Chen, H. Luo, and A. Alexandrov, “Identification of RMP24 and RMP64, human ribonuclease MRP-specific protein components,” Cell Rep., vol. 44, no. 6, 2025, doi: 10.1016/j.celrep.2025.115752.

[2] J. Wikarek and P. Sitek, “Proactive Scheduling and Routing of MRP-Based Production with Constrained Resources,” Applied Sciences (Switzerland), vol. 15, no. 15, 2025, doi: 10.3390/app15158522.

[3] L. Martins, C. Cardeira, and P. Oliveira, “Hybrid Path-Lifting Algorithm and Equivalence of Stability Results for MRP-Based Control Strategies,” IEEE Trans. Automat. Contr., vol. 70, no. 9, 2025, doi: 10.1109/TAC.2025.3565665.

[4] Y. Liu et al., “Composition and RNA binding specificity of metazoan RNase MRP,” Nucleic Acids Res., vol. 53, no. 16, 2025, doi: 10.1093/nar/gkaf829.

[5] E. M. Smith, J. Ly, S. Haug, and I. M. Cheeseman, “RNase MRP subunit composition and role in 40S ribosome biogenesis,” Nat. Struct. Mol. Biol., 2025, doi: 10.1038/s41594-025-01690-7.

[6] W. Seiringer, K. Altendorfer, T. Felberbauer, B. Bokor, and F. Brockmann, “How periodic forecast updates influence MRP planning parameters: A simulation study,” Simul. Model. Pract. Theory, vol. 142, 2025, doi: 10.1016/j.simpat.2025.103115.

[7] T. Ma, Y. Bin Huang, J. Chen, L. Zhang, Y. H. Liu, and C. H. Lu, “MRPL21 promotes HCC proliferation through TP53 mutation-induced apoptotic resistance,” Tissue Cell, vol. 86, 2024, doi: 10.1016/j.tice.2023.102298.

[8] J. I. Jaya, T. H. Ningsih, M. F. Taribuka, D. G. E. Faradhiba, I. Fajrianti, and E. A. Mokodompit, “SINERGI PENGELOLAAN PERSEDIAAN, MRP, DAN JIT: STRATEGI EFISIENSI OPERASIONAL DALAM RANTAI PASOK MODERN,” Jurnal HOMANIS: Halu Oleo Manajemen dan Bisnis, vol. 2, no. 2, 2025.

[9] J. Indra Jaya, T. Hardiyanti Ningsih, M. Florencia Taribuka, D. Gina Elyka Faradhiba, I. Fajrianti, and E. Agus Mokodompit, “SINERGI PENGELOLAAN PERSEDIAAN, MRP, DAN JIT: STRATEGI EFISIENSI OPERASIONAL DALAM RANTAI PASOK MODERN,” Jurnal HOMANIS: Halu Oleo Manajemen dan Bisnis, vol. 2, no. 2, 2025, doi: 10.55598/homanis.v2i2.106.

[10] F. Farchan, Azzatillah, Annisa, and Tiara Fitri Rizkiyah, “Efficiency Improvement in Production Using MRP Method at Kerupuk Udang Kelapa Company,” ORGANIZE: Journal of Economics, Management and Finance, vol. 4, no. 2, 2025, doi: 10.58355/organize.v4i2.152.

[11] J. C. Muyulema-Allaica, R. B. Usca-Veloz, F. E. Reyes-Soriano, P. M. Pucha-Medina, and J. F. Hidalgo-Hidalgo, “Framework for the Design of a Demand-Driven MRP (DDMRP) Model from Case Study,” Journal Europeen des Systemes Automatises, vol. 58, no. 2, 2025, doi: 10.18280/jesa.580205.

[12] A. Bataineh, Z. M. Shwiyat, and O. Al-Bataineh, “Do strategic management accounting techniques rationalise waste through implementing MRP system in the Jordanian industrial environment?,” International Journal of Procurement Management, vol. 22, no. 2, 2025, doi: 10.1504/IJPM.2025.143995.

[13] V. Lukinskiy, V. Lukinskiy, B. Sokolov, and D. Bazhina, “A probabilistic approach to reliability assessment of inventory management strategies in an MRP environment with random yield,” International Transactions in Operational Research, 2025, doi: 10.1111/itor.70096.

[14] D. Damand, Y. Lahrichi, and M. Barth, “A first optimization approach to parameterize demand-driven MRP in the presence of multiple products and finite capacity,” Flex. Serv. Manuf. J., vol. 37, no. 2, 2025, doi: 10.1007/s10696-024-09536-y.

[15] R. Amelia, “Analisis Pengendalian Persediaan Bahan Baku Kopi pada CV. Mahkota Jaya Abadi Padangsidimpuan,” 2017.

[16] A. Nur Aisa et al., “EVALUASI PENANGANAN KETERLAMBATAN MATERIAL PADA USAHA KAYU CILIK MENGGUNAKAN METODE MRP 1 (MATERIAL REQUIREMENT PLANNING 1) MENINGKATKAN EFISIENSI PRODUK,” Jurnal Simanis, vol. 4, 2025.

[17] A. Saepuloh and T. Ihsan, “Analisis Pengendalian Persediaan Komponen Panel Lower in Board Metode Material Requirement Planning ( MRP ) dengan Lot Sizing Fixed Order Quantity,” Journal Of Social Science Research, vol. 5, 2025.

[18] C. Sun, Z. Li, L. Guo, C. Zhu, B. Xu, and H. Qin, “Prognostic significance of serum Mrp 8/14 in acute respiratory distress syndrome induced by pulmonary and extrapulmonary sepsis: A retrospective controlled study,” Respir. Med., vol. 249, 2025, doi: 10.1016/j.rmed.2025.108417.

[19] W. E. Aprilian, S. Marliani, and J. Yuliawati, “Analisis Persediaan Bahan Baku Kedelai Menggunakan Metode EOQ pada Industri Rumahan Keripik Tempe Memey,” Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah, vol. 6, no. 3, pp. 3652–3660, 2023, doi: 10.47467/alkharaj.v6i3.5320.

[20] S. Wardani, S. Rahayuningsih, and A. Komari, “Analisis Pengendalian Ketersediaan Bahan Baku Di PT. Akasha Wira Internasional, Tbk Menggunakan Metode EOQ,” JURMATIS : Jurnal Ilmiah Mahasiswa Teknik Industri, vol. 2, no. 1, p. 22, 2020, doi: 10.30737/jurmatis.v2i1.860.

[21] A. A. Ramadhani and S. Nugroho, “Pengendalian Persediaan Sparepart Mesin Produksi Pada PT Semen Gresik Pabrik Rembang Menggunakan Metode EOQ dan POQ,” Prosiding SENIATI, vol. 6, no. 1, pp. 199–206, 2022, doi: 10.36040/seniati.v6i1.4944.

[22] S. Purnamadewi, S. Purnamasari, and T. Sriwidadi, “Planning and Controlling Raw Material of Balado Seasoning Using Material Requirements Planning (MRP) Method,” in Proceedings of the 7th North American International Conference on Industrial Engineering and Operations Management, Orlando, Florida, USA: IEOM Society International, 2023, pp. 1627–1635. doi: 10.46254/na07.20220380.

[23] D. Mayasari, “Analisis Pengendalian Persediaan Bahan Baku Menggunakan Metode Eoq (Economic Order Quantity) Pada Pt. Suryamas Lestari Prima,” Bis-a, vol. 10, no. 02, pp. 44–50, 2021, doi: 10.55445/bisa.v10i02.10.

[24] S. Yazid, “Kipas Portable dengan Menggunakan MRP Metode EOQ,” Talenta Conference Series: Energy & Engineering (EE), vol. 5, no. 1, pp. 664–670, 2022, doi: 10.32734/ee.v5i2.1633.

[25] A. P. Putra, J. Arifin, and D. Parlindungan, “Aplikasi Metode EOQ Dalam Efisiensi Total Biaya Persediaan dan Optimasi Pengendalian Persediaan Bahan Baku Thinner di PT. XYZ,” Jurnal Serambi Engineering, vol. 8, no. 3, pp. 6680–6687, 2023, doi: 10.32672/jse.v8i3.6296.

[26] I. G. Katiandagho, “Analisis dan Perancangan ROP , EOQ , Safety Stock Sistem Pengendalian Persediaan Bahan Baku Pada Rumah Makan Bubur Ayam Citarasa Analysis and design of ROP , EOQ , Safety Stock Inventory Control System of Raw Materials on Restaurant Bubur Ayam Citarasa,” vol. 02, no. 01, pp. 45–65, 2021.

[27] Wibowo, Hamdani Nurbahri, and Heri, “Analisa Perencanaan Kebutuhan Bahan Dengan Kriteria Minimasi Biaya Persediaan Bahan Baku Pada Pt. Fajar Utama Furnishing Bekasi,” Spektrum Industri, vol. 15, no. 1, pp. 27–36, 2017.

[28] Z. Zaharuddin, A. Alfyan, B. S. Kusuma, and A. A. Syarif, “Analisis Pengendalian Persediaan Bahan Baku Udang Di Pt. Bahari Makmur Sejati Medan,” Jurnal Al Ulum LPPM Universitas Al Washliyah Medan, vol. 10, no. 1, pp. 33–38, 2021, doi: 10.47662/alulum.v10i1.188.

22

Published

2026-01-23

How to Cite

Mustaqim, Adi Permana, B., & Diah Yuniawati, R. (2026). Pengendalian Bahan Baku Produk Jamu Sinom dengan Metode Material Requirement Planning untuk Meminimasi Biaya Produksi Di UD. Sanfaat. Ekliptika, 6(2), 57–66. https://doi.org/10.55757/ekliptika.v6i2.1205

Issue

Section

Articles